The Arora International at Heathrow T5 is a huge 610-bedroom hotel – one of the largest luxury airport hotel developments in Europe.

Our 32-week involvement in this massive project included designing, manufacturing, delivering and erecting 30,000m2 of bespoke precast concrete products.

These ranged from wall panels and hollowcore floors, to staircases and solid composite floors. Tight timescales meant that the team was frequently on site 24-hours a day, seven days a week.

Chairman of Arora International Hotels Ltd, Surjnder Arora said: “I am thrilled to see this project come to life despite the challenges that have faced the team from the outset. Tight timescales designed for completion in sync with the scheduled opening of Terminal 5 have been a considerable pressure, highlighting the professionalism of Bison in tackling these issues head-on and achieving such a magnificent result.”